After holes are drilled in the settled section of highway, polyurethane foam is injected under the slab. The foam expands to fill voids and raise the settled highway section. 15 seconds to expand, 15 minutes to cure. This job took 50 minutes start to finish, and used 205 lbs. of HMI polyurethane concrete raising material.

Commercial
GOAT CAROUSEL MILKING PAD STABILIZATION
Chilton, Wisconsin The Challenge RaiseRite works with many dairy and goat farms throughout Wisconsin, and one issue we continue to




