
Bridge Approach Concrete Lifting
Problem: Raise Rite Concrete Lifting was contacted by a highway construction company to repair two bridge approaches in Sault Ste. Marie, MI. Upon inspection of the road it was determined that the sleeper pads on each end of the bridge had settled about one inch. The sleeper pads had approximately



